Docket 55308
Notice of Proposed Rulemaking to Amend Rule 515-9-4 “Enforcement Procedures under the Georgia Utility Facility Protection Act” and 515-9-5 “Procedures Required under the Georgia Utility Facility Prote
This docket on the Commission's site
| Industry (Commission's label) | GUFPA |
|---|---|
| Opened | 2023-08-07 |
| Status | Open |
| Filings in the record | 4 |
| First and last filed | 2023-10-12 to 2023-12-07 |
| Staff unit | Electric |
| Committee | Energy |
| Files | 4 of 4 filings have a file to download |
Filings, newest first
| Filed | Filer | Filing |
|---|---|---|
| 2023-12-07 | GPSC | FINAL ORDER ADOPTING RULE 2 files to downloadElectric |
| 2023-11-13 | Georgia Power Company | GPC Letter Withdrawing Comments to Proposed NOPR to Revise Rules 515-9-4 and 515-9-5 Download fileElectric |
| 2023-11-02 | Georgia Power Company | COMMENTS OF GEORGIA POWER COMPANY ON THE PROPOSED RULEMAKING REGARDING REVISION TO COMMISSION RULE 515-9-4 AND 515-9-5 2 files to downloadElectric |
| 2023-10-12 | GPSC | Notice of Proposed Rulemaking to Amend Rule 515-9-4 “Enforcement Procedures under the Georgia Utility Facility Protection Act” and 515-9-5 “Procedures Required under the Georgia Utility Facility Protection Act" 3 files to downloadElectric |