Docket 16573

Georgia Power Company: Procedural and Scheduling Order for the Utilities Integrated Resource Plan Compliance Filings, Certification of Green Energy Programs

This docket on the Commission's site

Industry (Commission's label)Electric
Opened2011-12-18
StatusOpen
Filings in the record10
First and last filed2023-07-31 to 2026-06-26
Staff unitElectric
CommitteeEnergy
Files10 of 10 filings have a file to download

Filings, newest first

FiledFilerFiling
2026-06-26Georgia Power Company2026 PURPA Avoided Cost
Download fileElectric
2026-04-21GPSCORDER APPROVING CONSENT FOR DELEGATION OF OPERATIONAL RESPONSIBILITY FOR UPSON PPA
2 files to downloadEnergy Efficiency and Renewable Energy
2026-04-09Georgia Power CompanyRequest for Commission Approval of GPC’s Consent for Delegation of Operational Responsibility for the 1MW Upson PPA
Download fileElectricEnergy Efficiency and Renewable Energy
2025-10-06Georgia Power CompanyShort Term Needs Letter
Download fileElectric
2025-06-27Georgia Power CompanyGeorgia Power Company’s 2025 Avoided Cost and Solar Avoided Cost Projections
Download fileElectricEnergy Efficiency and Renewable Energy
2024-06-07Georgia Power CompanyGPC 2024 Avoided Cost Projections
Download fileElectric
2024-05-07Southern Alliance for Clean EnergyWithdrawal and Substitution
Download fileElectric
2023-10-13Georgia Power CompanyDKTs 4822 & 16573 - Avoided Cost Projections - Errata
Download fileElectric
2023-09-12Georgia Interfaith Power & Light and Southface Energy Institute, Inc.Notice of Withdrawal and Substitution of Counsel
Download fileElectric
2023-07-31Georgia Power Company2023 GPC Avoided Cost Projections
Download fileElectric